UK and Finnish technologies provide designers quicker reads of embodied carbon impacts of their structural and materials choices. "We've been waiting for [something like this] for as long as I've been in the industry," says one engineering firm manager.
ITER project researchers generated 59 megajoules of sustained energy, averaging 11 MW over five seconds, breaking a previous record by a factor of three
Industry has until March to develop a plan and funding to replace on mid-height buildings the type of cladding linked to the 2017 Grenfell Tower fire in London that caused 72 deaths.
Contractor Ferrovial used two 500-ton crawler cranes to raise and rotate six vertically cast floater elements for transport and assembly to support the 2-MW turbine in 85 ft of water.
The worldwide sector is set to rise 2.3% a year in real terms, reaching $16.6 trillion by 2030, with four of the 10 fastest growing markets in Asia, says a London-based economic forecaster.
Bechtel, Webuild, Strabag and Dragados are among bidders for the $1.3B, 1.5-GW Coire Glas project in Scotland, but project revenue uncertainties remain.