Long before any big trade shows rolled into the expanded spaces of Jacob K. Javits Convention Center, major construction work was on full display along two blocks on Manhattan’s West Side.
Faced with the constraints of an extremely narrow site, the Electric Park Garden Bar addition team found ways to leverage prefabrication to reduce downtime for subcontractors and keep the project on track.
The construction team on the $80-million Soaring Eagle Casino & Resort Guest Room Renovation bet that its employees and partners would improve as the project progressed—and they came up big.
To transform a WWII-era hangar into a high-tech modern facility for the U.S. Air Force, the team designed and constructed a building within a building.
The $50-million Carson Group headquarters features a six-story office structure joined to a four-story tower by an amenity hub. Both buildings use electrochromic envelopes to reduce energy loads and emissions.
To turn an underutilized block next to Chicago’s busiest commuter hub into a landmark 52-story building, the design and construction team had to dig deep for creative solutions.
The design and construction team delivered a 400-ft-long, five-span bridge that significantly improves safety and mobility by replacing an at-grade intersection that required people to cross six lanes of high-speed traffic.
Balancing the desire for an iconic bridge with the need to maintain a tight budget, T.Y. Lin International designed a curved bridge that spans the Fox River in the heart of downtown Aurora, Ill.