Harper General Contractors brought its ingenuity and creativity to bear in the $28.4-million effort to modernize the nearly 100-year-old RB Simms Water Treatment Facility in Chesnee, S.C.
The first phase of Atrium Health’s modernization of the Carolinas Medical Center Campus adds more than 1.2 million sq ft of space and two pedestrian bridges that connect new spaces back to the existing hospital campus and a surface parking lot.
When Emory Healthcare and Winship Cancer Institute of Emory University first approached the design and construction community in 2018 about their intention to build a cancer center, the stated goal was to create a facility “that has never been seen or imagined.”
Set on 200 acres near Auburndale, Fla., the $150.8-million tolls testing facility features 11 miles of roadway infrastructure designed to replicate diverse driving environments and simulate real-world conditions for testing self-driving cars.
With the world’s busiest airport facing additional capacity needs, this project provided five new domestic gates to the north end of Concourse T at Hartsfield-Jackson Atlanta International Airport.
Extensive planning and some fortuitous timing helped The Inn at Darden project team deliver a much needed upgrade to the University of Virginia’s hospitality offerings.
Long before the challenges presented by the COVID-19 pandemic emerged, the project team on the Children’s Hospital of Richmond faced a daunting goal: design and construct a 600,000-sq-ft acute care hospital on an urban campus in about four years.
Turner Construction will begin work on the University of Kansas David Booth Kansas Memorial Stadium in December, following the conclusion of the 2023 football season.