KBR Building Group completed work on the $23.9-million Triumph Aerostructures – Vought Aircraft Division manufacturing facility in September 2012 with no lost-time or recordable incidents during 110,614 man-hours on the job.
KBR Building Group completed work on the $23.9-million Triumph Aerostructures – Vought Aircraft Division manufacturing facility in September 2012 with no lost-time or recordable incidents during 110,614 man-hours on the job.
Linbeck Group completed work on the Turrell Skyspace at Rice University in July 2012. This one-of-a-kind art installation presented several construction challenges, including an interior and exterior "knife-edge" design and installation and a large flat soffit that could have no expansion joints.
Satterfield & Pontikes Construction performed a total renovation and revitalization of the 65,000-sq-ft NASA Johnson Space Center Building 12—built in the 1960s—to bring it into conformity with modern building codes and standards and to equip it with cutting-edge components.