August 2016
The Top Contractors list, published annually, ranks the general contractors, both publicly and privately held, based on construction contracting-specific revenue.
More Information On Top Contractors By Sectors:
View Top Contractors By Sectors
Related Article:
Growing Revenue, Strong Backlogs Keep Contractors Buzzing
Rank 2016/2015 |
Company / Location / Website /
Top Officer |
Largest Project to Break Ground its Location Project Value ($ Mil.) |
Market Sectors By % of Revenue |
Regional Rev. 2015 ($ Mil)** |
|
---|---|---|---|---|---|
1/1 |
SWINERTON INC.
San Francisco | swinerton.com Jeff Hoopes, CEO |
DE Shaw Springbok 2 Cantil 277.33 |
84 General Building 16 Power |
1,853.10 |
|
2/3 |
TURNER CONSTRUCTION CO.
Anaheim | turnerconstruction.com Michael J. Kuntz, Executive Vice President |
Ballpark Village San Diego 258.00 |
75 General Building 13 Transportation 9 Interior/Tenant Improvements |
1,571.00 |
|
3/2 |
DPR CONSTRUCTION
Redwood City | dpr.com Eric Lamb, Executive Vice President |
Confidential Project Irvine 500.00 |
74 General Building 24 Industrial Process 1 Telecommunications |
1,567.89 |
|
4/9 |
HENSEL PHELPS
Irvine | henselphelps.com Jon Ball, Executive Vice President |
San Francisco International Airport - Terminal 1C San Francisco 700.00 |
69 General Building 31 Transportation |
1,286.04 |
|
5/4 |
WEBCOR CONSTRUCTION LP DBA WEBCOR BUILDERS
San Francisco | webcor.com Jes Pedersen, President & CEO |
Metropolis Phase II Los Angeles 400.00 |
74 General Building 25 Transportation 1 Interior/Tenant Improvements |
1,252.11 |
|
6/6 |
MCCARTHY BUILDING COS.
Newport Beach | mccarthy.com Randy Highland, Regional President |
Rancho Los Amigos National Rehabilitation Center Downey 218.15 |
84 General Building 11 Transportation 5 Power |
1,248.72 |
|
7/— |
DEVCON CONSTRUCTION INC.
Milpitas | devcon-const.com Gary Filizetti, President |
NVIDIA Triangle Santa Clara Not Provided |
100 General Building |
1,161.85 |
|
8/12 |
HATHAWAY DINWIDDIE CONSTRUCTION CO.*
San Francisco | hdcco.com P. Greg Cosko, President & CEO |
USC Village Los Angeles 500.00 |
78 General Building 22 Interior/Tenant Improvements |
1,143.00 |
|
9/5 |
KIEWIT CORP.
Santa Fe Springs | kiewit.com Bruce Grewcock, CEO |
Not Provided |
39 Transportation 20 Power 19 Water Supply |
1,123.07 |
|
10/11 |
CLARK CONSTRUCTION GROUP
Irvine | clarkconstruction.com Richard Heim, CEO, Western Region |
East County Detention Center Indio 274.00 |
48 Transportation 45 General Building 5 Other Project Types |
950.15 |
|
11/13 |
RUDOLPH AND SLETTEN INC.
Redwood City | rsconstruction.com Martin Sisemore, President & CEO |
Washington Hospital - Morris Hyman Critical Care Center Fremont 240.00 |
99 General Building 1 Interior/Tenant Improvements |
940.00 | |
12/7 |
SKANSKA
Oakland | usa.skanska.com Len Vetrone, COO, USA Building; Don Fusco, COO, USA Civil |
Purple Line Extension Los Angeles 704.21 |
59 Transportation 39 General Building 2 Interior/Tenant Improvements |
925.94 |
|
13/10 |
GRANITE CONSTRUCTION INC.
Watsonville | graniteconstruction.com Pete Matheson, Senior Vice President, Group Operations |
Not Provided |
57 Transportation 23 Other Project Types 11 Water Supply |
810.66 |
|
14/15 |
LEVEL 10 CONSTRUCTION
Sunnyvale | level10gc.com Dennis Giles, President |
Central + Wolfe Sunnyvale 310.00 |
92 General Building 8 Manufacturing |
790.87 | |
15/49 |
HOLDER CONSTRUCTION CO.
San Jose | holderconstruction.com Gavin Kalley, Vice President |
Not Provided |
98 General Building 2 Telecommunications | 665.00 | |
16/18 |
THE WALSH GROUP LTD.
Los Angeles | walshgroup.com Matthew Walsh, Co-Chairman & CEO |
Common Mission Control Center Beale AFB 69.25 |
72 Transportation 20 General Building 6 Water Supply | 642.49 |
|
17/14 |
BALFOUR BEATTY US
Dallas | balfourbeattyus.com Ray Bond, President & CEO |
855 Brannan San Francisco 200.00 |
73 General Building 18 Transportation 9 Sewerage/Solid Waste |
604.14 |
|
18/20 |
C.W. DRIVER
Pasadena | cwdriver.com Dana Roberts, CEO |
Europa Temecula Hotel & Winery Temecula 50.00 |
100 General Building |
588.87 | |
19/16 |
FLATIRON CONSTRUCTION CORP.
Broomfield, Colo. | flatironcorp.com John DiCiurcio, President & CEO |
California High Speed Rail CP2-3 Fresno 617.00 |
95 Transportation 5 Water Supply |
538.38 | |
20/19 |
THE WHITING-TURNER CONTRACTING CO.
Irvine | whiting-turner.com Len Cannatelli, Executive Vice President |
Not Provided |
96 General Building 4 Industrial Process |
525.58 | |
21/23 |
SUNDT CONSTRUCTION INC.*
Sacramento | sundt.com Cody Pearson, Division Manager, Senior Vice President |
California Baptist University Event Center Riverside 66.13 |
80 General Building 20 Transportation |
511.45 | |
22/17 |
BERNARDS
San Fernando | bernards.com Douglas Bernards, CEO |
Pacific City Apartments Huntington Beach 185.00 |
100 General Building |
504.60 | |
23/22 |
SHIMMICK CONSTRUCTION CO.
Oakland | shimmick.com Paul Cocotis, Chairman & CEO |
Not Provided |
93 Transportation 7 Sewerage/Solid Waste |
462.22 | |
24/8 |
PCL CONSTRUCTION ENTERPRISES INC.*
Glendale | PCL.com Shaun Yancey, President & COO, US Operations |
CSU Fullerton Titan Student Union Expansion Fullerton 15.55 |
56 General Building 21 Petroleum 18 Water Supply |
440.53 | |
25/24 |
OLTMANS CONSTRUCTION CO.*
Whittier | oltmans.com Joseph O. Oltmans II, Chairman & CEO |
Not Provided |
68 General Building 16 Interior/Tenant Improvements 15 Transportation |
425.00 | |
26/25 |
XL CONSTRUCTION CORP.
Milpitas | xlconstruction.com Eric Raff, President |
Encinal Park (Confidential Client) Mountain View 250.00 |
100 General Building |
373.00 | |
27/— |
SUFFOLK CONSTRUCTION CO.*
San Francisco | suffolk.com Andrew Ball, President & CEO |
Eleven by Twelve Los Angeles 85.00 |
96 General Building 4 Power |
361.00 | |
28/38 |
BNBT BUILDERS INC.
Redwood City | BNBTBuilders.com David Becker, Principal |
Pinewood School, Middle Campus Renewal and
Expansion Los Altos Not Provided |
45 General Building 34 Interior/Tenant Improvements 21 Telecommunications |
349.00 | |
29/21 |
PANKOW BUILDERS
Pasadena | pankow.com Kim Lum, CEO |
Metropolis Phase 2 Residential Tower 3 Los Angeles 400.00 |
100 General Building |
342.72 | |
30/36 |
KPRS CONSTRUCTION SERVICES
Brea | kprsinc.com Joel Stensby, President |
Marina Park Community Center and Park Newport Beach 20.00 |
100 General Building |
319.27 | |
31/28 |
PLANT CONSTRUCTION CO. LP
San Francisco | plantconstruction.com Chris Rivielle, President & CEO |
The Urban School - Academic and Athletic Buildings San Francisco 24.41 |
100 General Building |
311.86 | |
32/43 |
MATT CONSTRUCTION
Santa Fe Springs | mattconstruction.com Marvin Wheat, President |
Coresite Data Center SV7 Santa Clara 139.00 |
100 General Building |
311.23 | |
33/32 |
MORLEY BUILDERS INC.
Santa Monica | morleybuilders.com Charlie Muttillo, President |
Academy Museum of Motion Picture Arts and Sciences Los Angeles 235.00 |
100 General Building |
306.75 |
|
34/45 |
JAMES E. ROBERTS - OBAYASHI CORP.
Danville | robertsobayashi.com Scott Smith, President & CEO |
South Hayward Market-Rate Hayward 50.19 |
100 General Building |
303.22 | |
35/33 |
CAHILL CONTRACTORS INC.
San Francisco | cahill-sf.com John E. Cahill Jr., Chairman & CEO |
923 Folsom Apartments San Francisco 44.00 |
100 General Building |
284.14 | |
36/54 |
DOME CONSTRUCTION CORP.
South San Francisco | domebuilds.com Mark Bley, President & CEO |
Confidential Project Not Provided 65.00 |
60 General Building 40 Industrial Process |
278.00 | |
37/41 |
LAYTON CONSTRUCTION CO. LLC
Irvine | laytonconstruction.com John Thornton, Executive Vice President |
Loma Linda University Medical Center Loma Linda Not Provided |
100 General Building |
271.60 | |
38/34 |
DEACON CORP.*
Citrus Heights | deacon.com Richard Smith, President |
District 1 Milpitas 99.07 |
100 General Building |
270.40 | |
39/39 |
LYLES CONSTRUCTION GROUP*
Fresno | lylesgroup.com Rick Amigh, President & CEO |
Southeast Surface Water Treatment Facility Fresno 158.77 |
79 Sewerage/Solid Waste 9 Water Supply 5 Power |
266.83 | |
40/35 |
C. OVERAA & CO.
Richmond | overaa.com Gerald D. Overaa, CEO |
Emerald Glen Aquatic Center Dublin 33.13 |
35 General Building 26 Water Supply 23 Sewerage/Solid Waste |
249.76 | |
41/47 |
BCCI CONSTRUCTION CO.
San Francisco | bcciconst.com Michael Scribner, President & CEO |
85 Bluxome San Francisco 16.00 |
78 Interior/Tenant
Improvements 22 General Building | 246.70 | |
42/26 |
MILLIE AND SEVERSON GENERAL CONTRACTORS*
Los Alamitos | mandsinc.com Brian T. Cresap, President |
The Brickyard Compton 36.22 |
100 General Building | 245.28 | |
43/27 |
SECURITY PAVING CO.*
Sylmar | securitypaving.com Michael Mattivi, President |
Not Provided |
100 Transportation |
239.16 | |
44/46 |
DRIVER URBAN
Irvine | driverurban.com Dana Roberts, President & CEO |
OTO Development - Hilton Garden Inn Burbank Burbank 32.00 |
100 General Building |
223.72 | |
45/40 |
O'NEIL INDUSTRIES INC./W.E. O'NEIL CONSTRUCTION CO.
El Segundo | weoneil.com John Finn, President, W.E. O'Neil Construction Co. of Calif. |
Sunrise Sabre Springs San Diego 20.07 |
75 General Building 20 Transportation 3 Manufacturing |
217.73 | |
46/— |
AVALONBAY COMMUNITIES INC.
Irvine | avalonbay.com Rob Salkovitz, Senior Vice President, Construction |
Avalon Dogpatch San Francisco 123.28 |
100 General Building |
214.43 | |
47/44 |
AMES CONSTRUCTION INC.*
Scottsdale, Ariz. | amesconstruction.net John Ames, Regional President |
Not Provided |
78 Transportation 18 Other Project Types 4 Water Supply |
207.00 |
|
48/42 |
NIBBI BROTHERS GENERAL CONTRACTORS
San Francisco | nibbi.com Robert L. Nibbi, President |
Alice Griffith Housing, Blocks 2 & 4 San Francisco 87.20 |
98 General Building 2 Transportation |
205.80 | |
49/56 |
BOMEL CONSTRUCTION CO.
Anaheim Hills | bomelconstruction.com Kent Matranga, President |
Alameda Square Parking Structure Los Angeles 66.44 |
100 General Building |
203.06 | |
50/53 |
R.D. OLSON CONSTRUCTION INC.
Irvine | rdolson.com William J. Wilhelm, President |
Ladera Sports Center Ladera Ranch 22.72 |
100 General Building |
202.90 | |
51/— |
ROEBBELEN CONTRACTING INC.
El Dorado Hills | roebbelen.com Kenneth Wenham, President & CEO |
Laurel School Upper Campus Menlo Park 25.60 |
96 General Building 4 Sewerage/Solid Waste |
196.60 |
|
52/70 |
VCC LLC
Irvine | vccusa.com Don Davis, Senior Vice President |
IKEA Burbank Burbank 60.54 |
100 General Building |
194.13 |
|
53/58 |
JOHNSTONE MOYER INC.
San Carlos | johnstonemoyer.com Bill Johnstone, CEO |
Not Provided |
100 General Building |
192.44 |
|
54/31 |
KITCHELL CORP.
Sacramento | kitchell.com Russell A. Fox, President, Kitchell CEM Inc. |
UCSD Outpatient Medical Office Building San Diego 140.00 |
98 General Building 1 Other Project Types 1 Transportation |
183.91 |
|
55/57 |
ALSTON CONSTRUCTION
Sacramento | alstonco.com Alecia Wilmeth, Vice President, General Manager |
Medline Tracy Tracy 55.12 |
100 General Building |
177.69 |
|
56/55 |
T.B. PENICK & SONS INC.
San Diego | tbpenick.com Tim Penick, President |
21st Century Library Hayward 48.89 |
97 General Building 3 Transportation |
174.75 |
|
57/37 |
AUSTIN COMMERCIAL
Los Angeles | austin-ind.com Ralph Ketchum, Regional Vice President |
Not Provided |
54 General Building 46 Transportation |
155.68 |
|
58/48 |
GILBANE BUILDING CO.
San Jose | gilbaneco.com Matthew P. Tierney, Senior Vice President |
Mission College Student Engagement Center Saratoga 54.27 |
77 General Building 23 Telecommunications |
142.10 |
|
59/73 |
OHL USA INC.
Irvine | ohlusa.com Tony Bagheri, Executive Vice President |
Fairway Drive Grade Separation Project City of Industry 71.99 |
66 Transportation 34 Water Supply |
132.30 |
|
60/60 |
CLUNE CONSTRUCTION CO.
Los Angeles | clunegc.com Bob Dahlstrom, President, West Region |
Not Provided |
100 Interior/Tenant
Improvements |
130.53 |
|
61/— |
SINANIAN DEVELOPMENT INC. DBA SINANIAN
Tarzana | sinanian.com Sinan Sinanian, President |
Topaz Apartments Los Angeles 28.00 |
100 General Building |
122.00 | |
62/59 |
MOOREFIELD CONSTRUCTION INC.*
Santa Ana | moorefieldconstruction.com Mike Moorefield, President |
Cinemark XD 14 at the Promenade Downey 13.00 |
91 General Building 9 Interior/Tenant Improvements |
121.77 |
|
63/— |
WEST VALLEY CONSTRUCTION CO.*
Campbell | wvcc.com Kevin P. Kelly, President & CEO |
Fair Oaks Ave Rule 20A Campbell 29.00 |
76 Water Supply 12 Telecommunications 10 Power |
111.87 |
|
64/51 |
O.C. JONES & SONS INC.*
Berkeley | ocjones.com Robert Layne, President & CEO |
Montague Expressway Milpitas 19.97 |
84 Transportation 14 General Building 1 Sewerage/Solid Waste |
110.25 | |
65/69 |
PAPICH CONSTRUCTION CO.
Grover Beach | papichco.com Jason Papich, President |
Caltrans 05-492804 Highway 1 San Simeon 19.72 |
67 Transportation 33 Power | 101.25 | |
66/64 |
GHILOTTI BROS. INC.
San Rafael | ghilottibros.com Michael M. Ghilotti, President |
Highway 101 Sonoma/Marin Counties Petaluma 32.72 |
75 Transportation 22 General Building 1 Manufacturing | 97.73 |
|
67/63 |
HARPER CONSTRUCTION CO.
San Diego | harperconstruction.com Jeff Harper, President |
UCSB San Joaquin Apartments Santa Barbara 127.51 |
99 General Building 1 Power |
90.49 |
|
68/65 |
DRIVER SPG (SPECIAL PROJECTS GROUP)
Anaheim | driverspg.com Karl Kreutziger, President |
Neuehouse Hollywood Los Angeles 13.30 |
100 General Building |
78.36 | |
69/72 |
BAYLEY CONSTRUCTION, A GENERAL PARTNERSHIP
Lake Forest | bayley.net Mark Florer, Vice President, Division Manager |
At Mateo Los Angeles 43.20 |
100 General Building |
77.25 | |
70/68 |
HAL HAYS CONSTRUCTION INC.
Riverside | halhays.com Kirby Hays, President & CEO |
Not Provided |
100 General Building |
75.36 | |
71/— |
SHAWMUT DESIGN AND CONSTRUCTION*
Los Angeles | Shawmut.com Vincent Spataro, Director of Southern California |
Victoria’s Secret - Union Square San Francisco Not Provided |
100 General Building |
72.40 | |
72/— |
THE PENTA BUILDING GROUP
Los Angeles | pentabldggroup.com Jeff Ehret, President |
Metropolis R3 Phase 2B (as Pankow PENTA LLC) Los Angeles |
100 General Building |
69.69 | |
73/— |
DCK CALIFORNIA CONSTRUCTION INC. (DCK WORLDWIDE)
Irvine | dckww.com Brian T. Contino, Sr. Vice President & General Manager |
Katella Grand Multifamily Complex Ph. 2 (Platinum Vista) Anaheim 59.50 |
99 General Building 1 Power |
65.83 | |
74/— |
TRAYLOR BROS. INC.
Long Beach | traylor.com Michael T. Traylor, Co-President |
Not Provided |
100 Transportation |
64.31 | |
75/74 |
KEMP BROS. CONSTRUCTION INC.
Santa Fe Springs | kempbros.com Greg Solaas, CEO |
Glendale Central Library Renovation Glendale 14.00 |
89 General Building 11 Transportation |
56.00 | |
76/71 |
PERERA CONSTRUCTION*
Ontario | pererainc.com Henry Perera Jr., President & CEO |
SCE Lugo Substation New Office Building Hesperia 5.63 |
69 General Building 31 Power |
55.18 | |
77/— |
AMG & ASSOCIATES
Santa Clarita | amgassociatesinc.com Albert Giacomazzi, President |
El Camino College Parking Structure Torrance 22.00 |
100 General Building |
48.00 | |
78/77 |
AGI GENERAL CONTRACTING
Stanton | agigc.com Chris Gautreau, President |
Anaheim Medical Shell Anaheim 32.10 |
100 General Building |
45.40 | |
79/75 |
ALABBASI
Perris | alabbasi.biz Marwan AlAbbasi, President |
Romoland MDP Line A Stage 4-6 and Briggs Basin Menifee 26.85 |
70 Sewerage/Solid Waste 19 Transportation 6 Water Supply |
43.01 | |
80/67 |
J.R. FILANC CONSTRUCTION CO.
Escondido | Filanc.com Mark Filanc, CEO |
Richard A. Reynolds Sweetwater Desalination Phase II
Expansion Chula Vista 14.73 |
81 Sewerage/Solid Waste 19 Water Supply |
41.84 | |
81/84 |
CRB BUILDERS LLC
Carlsbad | crbusa.com Chuck Glynn, Regional Leader |
Pacira Bulk Chemical Tank Farm San Diego 1.96 |
100 Industrial Process |
41.39 | |
82/76 |
STAPLES CONSTRUCTION CO.
Ventura | staplesconstruction.com David Staples, President |
Lexus of Thousand Oaks Thousand Oaks 15.30 |
100 General Building |
38.40 | |
83/78 |
COLORADO STRUCTURES INC.*
Irvine | csigc.com Joseph Hall, Vice President |
Carmax Pleasanton 13.00 |
100 General Building |
30.00 |
|
83/— |
FULCRUM CONSTRUCTION INC.
Marina Del Rey | Fulcrum Construction Inc Willy Rosner, President |
Montclair Shopping Center Montclair 5.00 |
100 General Building |
30.00 | |
85/83 |
I.E.-PACIFIC INC.
Escondido | iepacific.com Diane Koester-Byron, President |
DB P593 Triton Maintenance Facility NBVC 16.37 |
100 General Building |
26.66 | |
86/81 |
SEALS/BIEHLE INC.
Visalia | seals-biehle.com Steve Seals, President |
Alpaugh Education Center Phase II Alpaugh 4.95 |
100 General Building |
26.57 | |
87/82 |
BRAHMA GROUP INC.*
Salt Lake City | brahmagroupinc.com Sean Davis, President & COO |
ALKY Turnaround Richmond 3.20 |
51 Petroleum 33 Power 17 Industrial Process |
15.62 | |
88/— |
GLEN/MAR CONSTRUCTION INC.
Clackamas, Ore. | glenmarconstruction.com Mary E. Brown, President |
Not Provided |
100 General Building |
13.22 | |
89/— |
GARNEY HOLDING CO.
Livermore | garney.com Bill E. Williams, Director of Northern California Operations |
Water Recycling Pipeline Phase 1A Elk Grove 3.16 |
75 Water Supply 25 Sewerage/Solid Waste |
10.87 | |
90/85 |
ARBOR BUILDING GROUP INC.
Lafayette | arborbuildinggroup.com Richard Dunn, Principal |
Creekside Walk Apartments El Cerrrito 28.13 |
100 General Building |
8.04 | |
*REVENUE WAS PROVIDED ON A FISCAL-YEAR BASIS. ALL OTHERS PROVIDED CALENDAR-YEAR DATA, WHICH IS PREFERRED. **INCLUDES REVENUE GENERATED FROM GENERAL CONTRACTING, DESIGN-BUILD AND CONSTRUCTION MANAGEMENT AT-RISK AS WELL AS FEES FROM PROGRAM MANAGEMENT AND CONSTRUCTION MANAGEMENT FOR FEE. |
Copyright ©2024. All Rights Reserved BNP Media.
Design, CMS, Hosting & Web Development :: ePublishing