The fix is under way of the fractured twin plate girders that span 80 ft across Fremont Street in the 4.5-block-long Salesforce Transit Center in San Francisco, but a reopening date is not yet set.
The proposed bypass fix for the troubled Fremont Street girders of San Francisco's Salesforce Transit Center calls for bolting 20-in.-wide steel cover plates above and below the fractured bottom flange, like a double splint.