Built to help fish traverse the Deschutes River, Tumwater Falls Hatchery welcomes 250,000 annual park visitors and 3.8 million Chinook salmon each year.
The Gideon Street Overcrossing in Portland, Ore., now links the old and the new with a bicycle and pedestrian bridge over five separate railway tracks, crossing the TriMet light rail and Union Pacific Railroad tracks, and restoring an important connection in the Hosford-Abernethy neighborhood.
As a telecommunications company, T-Mobile US knows the power of strong connections. The team renovating its Bellevue, Wash., headquarters paid special attention to connecting multiple buildings throughout the campus, which spans more than 1 million sq ft of office space.
Built in 1931, the historic St. Edward Seminary in Kenmore, Wash., has been reimagined as a hotel and public amenity for visitors to St. Edward State Park.
Built in 1908, Seattle’s historic Webster Elementary School underwent repeat renovations in the subsequent decades that packed the structure with engineering surprises.
With multiple police departments housed in aging and undersized facilities across Salem, Ore., the city needed a new headquarters to bring 29 departments under one roof.
Situated on a hilltop with panoramic views of four iconic Northwest mountains, Willamette National Cemetery’s natural landscape both helped and hindered its phased expansion. The design-build project for the Dept. of Veteran Affairs (VA) expanded and improved the cemetery after a 38.2-acre land acquisition.
Time was on the side of the team building the California Creek Fish Passage Project, designed to replace the stream crossings beneath four separate roadways to better support the area’s fish and wildlife.