Rail Record-Setting Tunnel Under the Alps Reaches Interim Milestone Peter Reina May 27, 2022 No Comments An excavator recently broke through a wall separating two sections of the $9.6-billion Brenner Base Tunnel, creating a 24.1-km continuous bore from the south portal at Fortezza, Italy to the Austrian border. Read More