Gabriel Neves, Tekla bridge structures manager, recalls meeting Sigmund Reinsborg Log, head of section/head of verification and approval for the Department of Structures, an authoritative body of Norway’s Directorate of Public Roads.
When the Norwegian Public Roads Administration asked the design-build team of Sweco, PNC, Armando Rito Engenharia and Isachsen to deliver a 643-meter-long concrete box-girder bridge completely in 3D, designers with Armando Rito were initially a bit skeptical.
A cloud-based digital engineer is hovering nearby, ready to calculate, design and optimize thousands of bolted and welded connections on 3D Tekla models as a service to subscribers.