The pandemic is driving rapid change in design and construction technology, but the same adoption rigor that existed before it still delivers the best results.
MEP Subcontractors are the unsung heroes of prefabrication and they can help designers and contractors embrace a leaner, better construction process if they'll listen to their prefab sherpas.
This $91-million, 223,000-sq-ft building not only features laboratory, office and administrative spaces, but also a basement vivarium, two underground cisterns with 24,000 gallons of capacity and tunnels designed to connect to two future buildings.