In her viewpoint column, “Managing the Construction Manager in a Cost-Plus Contract,” Barbara Res expresses a significantly obsolete understanding of agency construction management.
In your story on the Permanent Canal Closures and Pumps project in New
Orleans (ENR 5/9 p. 24), with regard to the severity of Hurricane Katrina’s storm surge in Lake Pontchartrain, wave heights were typically similar to those assumed for the design of the structures (IPET, vol. 1, p. 2).
The article “CM Schools Boost Standards With First US Accreditations” (ENR 10/19 p. 17) is misleading in its title and inaccurate throughout much of the content.