A joint venture of Filanc and Brown and Caldwell has been tapped as design-builder for a membrane filtration reverse osmosis facility for the City of Escondido, Calif. Construction is expected to begin in spring 2020.
A $25-million demonstration project under construction in Suffolk, Va., will show officials from the Hampton Roads Sanitation District how to address a myriad of problems facing the water utility, including a rapidly shrinking water aquifer, land subsidence and a potential checklist of requirements for restoration of the Chesapeake Bay.