ENR’s Critical Path Podcast delivers insights from leading industry experts and decision-makers about the latest construction industry innovations, issues and developments.
Cofounder and president of HeadLight Si Katara has led his photo-based inspection technology to wide adoption by contractors and owners such as the Louisiana Dept. of Transportation and Development. The DOTD was already conducting a pilot project with HeadLight in 2020 when five hurricanes and power outages across the state after Hurricane Laura pressed it into service and employees were able to use HeadLight to view real-time updates from colleagues about the outages. Katara also discusses the changing face of cloud-based construction technology with Aileen Cho and Jeff Yoders
In fall 2020, a random truck collision caused a raging fire on the Brent Spence Bridge, closing the critical crossing. Hear how the Kentucky Transportation Cabinet, aided by Michael Baker International, managed to reopen the bridge in 42 days.
ENR California Editor Erica Berardi joins Senior Editor Aileen Cho to chat with Eric Foster about a venerable California company’s expansion to the East Coast.
ENR editors Aileen Cho and Jeff Yoders talk to the ENR equivalent of a Grammy Award-winning rock star. AOE winner John Hillman stars in “Where are they Now?” (and yes, he plays drums).
A multiple-degree-holding 30-something, the outgoing CEO of Bridges to Prosperity reminisces about globetrotting adventures and chats about new entrepreneurial challenges
Bob Clark has grown Clayco from a small St. Louis design-builder more than 30 years ago into an annual high performer on the ENR Top 400. In this ENR Exec Talk, he talks with Jeff Yoders and Aileen Cho about his Ride the Wave tour where he’s visiting all of Clayco’s job sites, how he founded the company on the premise of changing adversarial and antiquated processes, a bad call from OSHA on encouraging employees to get vaccinated and how far the industry still has to go to deliver the employee diversity results it needs.
CannonDesign’s vice president and director of BIM and VDC programs tells us about levels of development, modular construction, how architects and contractors are creating more model-friendly contract documents that allow better collaboration in the design and construction process, the changing process of project delivery and how redesigning that process, itself, has become a challenge, and even a little about working remotely during the pandemic.