KC3 Nuuly Expansion

Raymore, Mo.

BEST PROJECT

Submitted by: Brinkmann Constructors

Owner: URBN Urban Outfitters Inc.

Lead Design Firm: New Studio Architecture LLC

General Contractor: Brinkmann Constructors

Civil Engineer: Continental Consulting Engineers Inc.

Structural Engineer: ANH Structures Inc.

MEP Engineer: Victus Engineering


This project converted a 1-million-sq-ft speculative warehouse into a 600,000-sq-ft industrial dry cleaning, laundry, office and distribution facility.

KC3 Nuuly Expansion

Photo courtesy of Brinkmann Constructors

The design and construction team encountered several challenges including design complexity, constructibility, procurement, logistics and safety issues.

KC3 Nuuly Expansion

Photo courtesy of Brinkmann Constructors

Retrofitting an existing warehouse into a state-of-the-art facility required pre-ordering equipment such as a cutting-edge clothing carousel that can track, store and distribute more than 2 million garments.

KC3 Nuuly Expansion

Photo courtesy of Brinkmann Constructors

Thinking ahead led to streamlined operations, reduced labor and optimized facility efficiency. It also enabled the team to move swiftly once the final facility location was selected.

KC3 Nuuly Expansion

Photo courtesy of Brinkmann Constructors

The team issued multiple design phases ahead of the final design to jump-start construction, ensuring that it stayed on budget and on deadline.