This 4-acre outdoor plaza features a multiseason 11,725-sq-ft rink for ice and roller skating, a splash pad, a multipurpose Adventure Hub and retail building.
Six overlapping phases with concurrent design and construction transformed part of an existing 450,000-sq-ft corporate campus into a co-located and modernized facility for several state of Utah public agencies.
A 399,000-sq-ft replacement facility for Canyons School District required the phased demolition of an old school, which remained occupied, on a constrained site.
A four-story, 130,000-sq-ft steel-framed structure with a stone and brick exterior is the new home of Weber State’s engineering, applied science and technology departments.
More than 15,000 vehicles travel S.R. 172 (5600 West) daily in Utah’s Salt Lake Valley, but an at-grade crossing with the Union Pacific Railroad was creating up to eight hour delays on this two-lane corridor.
Utah State’s newest single-story academic building is combustion free and all electric. As the university’s first net-zero facility, it is designed to meet LEED Silver, but the team is seeking LEED Gold.
At 6,000 sq ft, this cyclotron radiochemistry facility serves as a manufacturing source of radiopharmaceuticals, which are used in positron emission tomography (PET) scans that provide vital clinical care and research information on illnesses such as cancer, dementia and cardiovascular diseases.
Idaho’s first dedicated industrial complex consists of six concrete tilt-up warehouses with 32-ft clearances and 52-ft column spacing, offering tenants maximum flexibility.