Veralto, the newly formed offshoot of the life sciences conglomerate Danaher that is dedicated to enhanced water quality and natural reserve protection, sought office space that embodies its commitment to environmental stewardship and technological innovation.
Transforming a three-building complex that houses and supports campus programming and initiatives related to access, equity and inclusion, the project includes a mass timber hybrid addition and comprehensive renovations to an adjacent 19th-century building that now has all new electric systems.
The 165,000-sq-ft biotech production facility has a conferencing center, shipping and logistics areas, underground parking, collaboration spaces and multiple roof terraces.
Situated in the heart of the Endicott College campus, the four-story, 70,000-sq-ft Cummings School building is designed for experiential learning with linking classrooms, labs, offices, multipurpose meeting rooms, lounge spaces and support rooms.
Massachusetts will take all but 200 MW of the 2.87-GW procurement, with the rest to Rhode Island, but bidders were wary, submitting for well under the 6.8-GW offered by the two states—and Connecticut failed to seek any capacity.
Recovering from a catastrophic fire required creative thinking and brought a rare opportunity to update and refurbish a critical health care facility for the region.
First installed turbine at the 132-GW South Fork project off the New York coast has now sent wind energy to the state grid, with first power flow also imminent at the 800-MW Vineyard Wind project off Massachusetts and other state projects pushing past ongoing constraints.