Three-building $1.8B project next to lake in Tempe, Ariz. faced issues in foundation work, which penetrates three levels down into the Salt River’s alluvial soil and cobble.
Planned 205,000-sq-ft, three-story building would replace training center built in 1990 on a 26-acre campus in Englewood, Colo., according to the team.