With a site situated at an altitude of 9,500 ft, three tower cranes were needed to construct this $222-million hotel and casino in the heart of Cripple Creek.
Seated across a 7-acre site in Sioux Falls are two new mixed-use residential buildings with street-level retail and restaurant spaces, a six-story office building with commercial space and a 10-story Class A office building, plus various amenities and a 650-space parking garage.
Situated at 11,207 ft above sea level, this $26-million, two-story restaurant features a seamless connection to Copper Mountain ski resort’s American Eagle gondola, which unloads on the second-floor deck, providing easy access for guests. The space also offers 180-degree views of the Gore Range and the Ten Mile Range.
As part of a three-mile greenway project that connects neighborhood green spaces, this pocket park and intersection improvements project turned outdated infrastructure into safe and culturally relevant play spaces.
A $286-million 12-story patient tower now sits on the western side of UCHealth’s Aurora hospital, adding much-needed health care space and services to metro Denver. Completed in May 2024, the tower offers 215 private inpatient rooms, 10 operating rooms and expanded emergency services.
This $34.1-million project included a 55,000-sq-ft expansion for technical education and STEM education programs as well as a 41,500-sq-ft renovation in an effort to bolster Brighton High School’s capacity to provide life-changing programming for its students.
A four-month tenant improvement project converted a portion of Meow Wolf’s Denver exhibition Convergence Station into an immersive bar lounge that features just one 90-degree angle and an overall circular design with curvature walls and a ceiling-suspended stage crown.
A former department store has been transformed into a modern office space and laboratory for Biodesix, a life sciences company that develops tools to detect lung disease.
On the final 18-mile, four-lane stretch of I-25 between Denver and Colorado Springs, a $330-million project has added a tolled express lane in each direction, improved safety for the traveling public and added four wildlife underpasses, more than 28 miles of wildlife exclusion fence and widened shoulders.