Crews are preparing to remove a 5,000-ton section of bridge steel from the deck of the cargo vessel M/V Dali, in hopes of refloating the vessel and further clearing the channel blocked by the collapse of the Francis Scott Key Bridge.
The U.S. Dept. of Defense announced it has passed the halfway mark on construction of a temporary floating pier structure in the Mediterranean Sea near the Gaza Strip.