Construction is set to begin this month on the world’s tallest solar tower—a 787-ft-high structure in Israel’s Negev desert that will supply 1% of the country’s power.
From its humble beginnings in 1967, when construction teams were mustered at the owner’s home, to being ranked 254th on ENR’s Top 400 Contractors list in 2015, Indianapolis contractor Bowen Engineering Corp. has grown strategically while playing to its strengths.
As uncertainty keeps contractors relying on rental equipment, aerial-work platform use is growing, says a new study by the International Powered Access Federation.