In a race to fix the damaged Oroville Dam’s main spillway by November, California Dept. of Water Resources, the operator of the country’s tallest dam, is going to bid with a 65%-complete design that breaks recovery efforts into three parts, with an ultimate goal of doubling the main spillway’s release