July 2023
The Top Contractors list, published annually, ranks the general contractors, both publicly and privately held, based on construction contracting-specific revenue.
More Information on Top Contractors By Sectors:
View Top Contractors By Sectors
Related Article:
Despite Headwinds, West Coast Builders Remain Optimistic
Click below for earlier editions:
2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 | 2015 | 2014 | 2013 | 2012 | 2011 | 2010 | 2009
Rank 2023/2022 |
Company Location/Website Top Officer |
Largest Project to Break Ground Location Project Value ($ Mil.) |
Market Sectors By % of Revenue** | Regional Rev. 2022 ($ Mil) | |
---|---|---|---|---|---|
1/1 | SWINERTON Concord, Calif. | swinerton.com Eric Foster, CEO |
555-585 Bryant Street San Francisco 273.99 |
96 General Building 4 Transportation |
2,800.70 | |
2/3 | DPR CONSTRUCTION Redwood City, Calif. | dpr.com Jody Quinton, Executive Vice President |
Confidential Project Sacramento 391.46 |
58 General Building 35 Industrial Process 6 Telecommunications |
2,516.44 | |
3/2 | HENSEL PHELPS Irvine, Calif. | henselphelps.com Brad Jeanneret, Executive Vice President |
Harbor-UCLA Medical Center Replacement Program Torrance, Calif. 1,110.00 |
64 General Building 31 Transportation 4 Sewerage/Solid Waste |
2,406.05 | |
4/5 | MCCARTHY BUILDING COS. Newport Beach, Calif. | mccarthy.com Mike Myers, Regional President |
Gaylord Pacific Resort Hotel and Convention Center Chula Vista, Calif. 378.00 |
74 General Building 23 Power 2 Industrial Process |
2,256.45 | |
5/4 | DEVCON CONSTRUCTION INC. Milpitas, Calif. | devcon-const.com Gary Filizetti, President |
Not Provided | 100 General Building |
2,232.50 | |
6/9 | TURNER CONSTRUCTION CO. Anaheim | turnerconstruction.com Abrar Sheriff, Executive Vice President |
San Diego International Airport (SDIA) New Terminal 1 San Diego 2,610.00 |
70 General Building 14 Interior/Tenant Improvements 13 Transportation |
2,032.00 | |
7/8 | CLARK GROUP Irvine, Calif. | clarkconstruction.com Mike Hartman, Group CEO |
UCSD Pepper Canyon Living and Learning Neighborhood La Jolla, Calif. Not Provided |
88 General Building 12 Transportation |
1,723.50 | |
8/— | GRANITE CONSTRUCTION INC. Watsonville, Calif. | graniteconstruction.com Brian Dowd, SVP, Group Manager |
American River Bridge Replacement Sacramento 50.14 |
79 Transportation 11 General Building 6 Water Supply |
1,427.05 | |
9/6 | HATHAWAY DINWIDDIE CONSTRUCTION CO.* San Francisco | hdcco.com Greg Cosko, President & CEO |
Kilroy Oyster Point Phase 2 South San Francisco, Calif. Not Provided |
100 General Building |
1,395.37 | |
10/7 | PCL CONSTRUCTION ENTERPRISES INC.* Glendale, Calif. | pcl.com Deron Brown, President & COO, U.S. Operations |
Oliver P. Roemer Water Treatment Plant Facility Upgrades and Reconstruction Rialto, Calif. 59.12 |
82 General Building 6 Water Supply 5 Transportation |
1,145.25 | |
11/12 | THE WHITING-TURNER CONTRACTING CO. Irvine, Calif. | whiting-turner.com Troy Caldwell, Executive Vice President |
Aggie Square Sacramento Not Provided |
95 General Building 2 Industrial Process 2 Transportation |
1,092.73 | |
12/16 | BALFOUR BEATTY US San Diego | balfourbeattyus.com Brian Cahill, President, California - US Buildings; Mark Konchar, President, Civils |
San Diego Unified School District - Point Loma High School San Diego 68.03 |
47 General Building 45 Transportation 8 Sewerage/Solid Waste |
1,039.17 | |
13/15 | KPRS CONSTRUCTION SERVICES INC. Brea, Calif. | kprsinc.com Joel Stensby, Founder & CEO |
Integrated Science Center Claremont, Calif. 150.00 |
100 General Building |
1,035.00 | |
14/11 | WEBCOR San Francisco | webcor.com Matt Rossie, CEO & President |
Not Provided | 83 General Building 11 Sewerage/Solid Waste 3 Transportation |
1,021.00 | |
15/13 | LEVEL 10 CONSTRUCTION Sunnyvale, Calif. | level10gc.com Paul Moran, CEO & President |
Not Provided | 100 General Building |
985.87 | |
16/18 | FLATIRON CONSTRUCTION INC. Concord, Calif. | flatironcorp.com Dale Nelson, Senior Vice President |
Orinda WTP Disinfection Improvement Orinda, Calif. 263.89 |
85 Transportation 9 Water Supply 3 Sewerage/Solid Waste |
886.31 | |
17/14 | AECOM TISHMAN | AECOM HUNT* Los Angeles | aecom.com Timothy Smith, Executive Vice President, Region Manager |
3545 Wilshire Los Angeles Not Provided |
90 General Building 6 Power 3 Transportation |
876.51 | |
18/— | BUILD GROUP San Francisco | buildgc.com Nathan Rundel, CEO |
UC Berkeley Hellen Diller Anchor House Berkeley , Calif. 282.30 |
97 General Building 2 Manufacturing 1 Interior/Tenant Improvements |
848.18 | |
19/20 | XL CONSTRUCTION Milpitas, Calif. | xlconstruction.com Richard Walker, CEO |
Confidential Project Sunnyvale, Calif. 215.80 |
100 General Building |
806.50 | |
20/25 | MILLIE AND SEVERSON GENERAL CONTRACTORS* Los Alamitos, Calif. | mandsinc.com Benjamin Severson, President |
Prologis - Merrill Commerce Center Building 7 Ontario, Calif. 96.01 |
95 General Building 5 Interior/Tenant Improvements |
746.92 | |
21/17 | SKANSKA USA New York | usa.skanska.com Jim Link, Regional Executive Officer (Building); Gordon Childress, Executive Vice President & General Manager (Building); Mike Aparicio, Executive Vice President (Civil) |
State Route 71/91 Interchange Improvement Project Corona, Calif. 120.50 |
60 Transportation 23 General Building 14 Manufacturing |
732.56 | |
22/28 | O'NEIL INDUSTRIES INC./W.E. O'NEIL CONSTRUCTION CO. OF CALIFORNIA El Segundo, Calif. | weoneil.com John Finn, President |
Los Angeles World Airports MSC South (Midfield Satellite Concourse) Los Angeles 275.00 |
87 General Building 12 Manufacturing 1 Power |
689.64 | |
23/24 | TRUEBECK CONSTRUCTION San Mateo, Calif. | truebeck.com David Becker, Co-Founder & CEO |
Alexandria Center for Life Science (ACLS) Millbrae, Calif. Not Provided |
100 General Building |
652.64 | |
24/23 | C.W. DRIVER COS. Pasadena, Calif. | cwdriver.com Dana Roberts, CEO |
Santa Monica-Malibu USD - New Malibu High School Malibu, Calif. 101.00 |
100 General Building |
565.86 | |
25/26 | THE WALSH GROUP Corona, Calif. | walshgroup.com Matt Walsh, Co-Chairman |
Not Provided | 31 Transportation 29 General Building 29 Sewerage/Solid Waste |
532.55 | |
26A***/30 | BERNARDS San Fernando, Calif. | bernards.com Dave Cavecche, Chief Executive Officer |
Avenue 34 Apartments Los Angeles, Calif. 146.62 |
100 General Building | 508.24 | |
26/29 | SHIMMICK Irvine, Calif. | shimmick.com Andrew Sloane, Executive Vice President |
Mosquito Road Bridge Camino, Calif. 74.40 |
46 Water Supply 40 Transportation 9 Sewerage/Solid Waste |
506.29 | |
27/49 | BURNS & MCDONNELL Brea, Calif. | burnsmcd.com Rashmi Menon, Vice President, General Manager |
Confidential Aerospace Project California Not Provided |
44 Power 38 Industrial Process 10 Manufacturing |
427.82 | |
28/— | LAYTON CONSTRUCTION/ABBOTT CONSTRUCTION Irvine, Calif. | laytonconstruction.com Tyler Dillon, Executive Vice President; Troy Stevens, Executive Vice President; Michael Sloane, Vice President; Larry Lantero, Vice President |
Mercy Hospital Southwest - Bakersfield New Patient Tower Bakersfield, Calif. 220.00 |
84 General Building 15 Telecommunications 1 Industrial Process |
427.41 | |
29/43 | SKYLINE CONSTRUCTION San Francisco | skylineconstruction.build Rene Olivo, President |
Not Provided | 86 Interior/Tenant Improvements 14 General Building |
427.00 | |
30/36 | LYLES CONSTRUCTION GROUP Fresno, Calif. | lylesgroup.com Richard G. Nemmer, President & CEO |
East County Advanced Water Project Santee, Calif. 460.00 |
72 Sewerage/Solid Waste 10 Water Supply 8 General Building |
425.01 | |
31/33 | SUNDT CONSTRUCTION INC.* Irvine, Calif. | sundt.com Ryan Nessen, Senior Vice President, Building, California |
San Diego International Airport Administration Building San Diego 97.40 |
52 Sewerage/Solid Waste 38 General Building 8 Transportation |
423.87 | |
32/41 | GILBANE BUILDING CO. San Jose, Calif. | gilbaneco.com Jeff Park, Vice President |
California State University, Northridge Sierra Annex Northridge, Calif. 45.00 |
51 Manufacturing 40 General Building 7 Transportation |
409.28 | |
33/31 | CAHILL CONTRACTORS LLC San Francisco | cahill-sf.com Kathryn Cahill Thompson, CEO |
Protrero Block B San Francisco 129.30 |
93 General Building 5 Master-Planned Development/Site Infrastructure 1 Interior/Tenant Improvements |
408.27 | |
34/34 | NIBBI BROS. ASSOCIATES INC. San Francisco | nibbi.com Robert L. Nibbi, President & CEO |
Not Provided | 96 General Building 4 Transportation |
396.54 | |
35/37 | SUKUT CONSTRUCTION LLC* Santa Ana, Calif. | sukut.com Steve Yurosek, CEO & President |
Not Provided | 34 Water Supply 24 Sewerage/Solid Waste 24 General Building |
382.60 | |
36/42 | C. OVERAA & CO. Richmond, Calif. | overaa.com Chris Manning, CEO |
San Leandro High School Gym San Leandro, Calif. 45.00 |
58 General Building 20 Sewerage/Solid Waste 14 Water Supply |
377.65 | |
37/27 | THE PENTA BUILDING GROUP Los Angeles | pentabldggroup.com Paul Dutmer, Vice President - Southern California |
Cotino Master Development Rancho Mirage, Calif. 80.00 |
100 General Building |
366.54 | |
38/50 | BCCI CONSTRUCTION San Francisco | bcciconst.com Michael Scribner, CEO |
Confidential Tech Project San Jose, Calif. 25.00 |
95 General Building 5 Industrial Process |
350.72 | |
39/56 | R.D. OLSON CONSTRUCTION Irvine, Calif. | rdolson.com William J. Wilhelm, President |
Solana at Duarte Station Apartments Duarte, Calif. 96.10 |
100 General Building |
345.10 | |
40/39 | PLANT CONSTRUCTION CO. San Francisco | plantconstruction.com Chris Rivielle, President & CEO |
SFO Mel Leong Sewer Treatment Plant San Francisco Not Provided |
100 General Building |
331.43 | |
41/54 | CLUNE CONSTRUCTION Los Angeles | clunegc.com Randy Starbird, Executive Managing Director, President, West Region |
Company3 Los Angeles 44.51 |
79 Interior/Tenant Improvements 21 Telecommunications |
306.77 | |
42/62 | HITT CONTRACTING Santa Clara, Calif. | hitt.com John Kane, Senior Vice President |
Confidential Headquarters Project Irvine, Calif. 42.00 |
59 General Building 38 Telecommunications 4 Interior/Tenant Improvements |
303.89 | |
43/46 | ARCO CONSTRUCTION COS. St. Louis | arcoconstruction.com Jeff Cook, Co-Founder |
Not Provided | 100 General Building |
288.52 | |
44/58 | HARPER CONSTRUCTION CO. San Diego | harperconstruction.com Jeff Harper, President |
P391 F-35C Maintenance Hangar Addition NAS Lemoore, Calif. 102.90 |
100 General Building |
285.79 | |
45/52 | BLACH CONSTRUCTION* San Jose, Calif. | blach.com Daniel L. Rogers, President |
MUSD Innovation Center Milpitas, Calif. 66.38 |
91 General Building 9 Interior/Tenant Improvements |
282.18 | |
46/32 | MATT CONSTRUCTION Norwalk, Calif. | mattconstruction.com Steve F. Matt, Chairman& CEO |
Samuel Oschin Air and Space Center Los Angeles 250.00 |
100 General Building |
281.00 | |
47/55 | KITCHELL CORP. San Diego | kitchell.com Michael Wolfe, Regional Vice President - Kitchell Contractors; Wendy Cohen, President - Kitchell CEM |
Not Provided | 100 General Building |
275.86 | |
48/45 | MORLEY BUILDERS Santa Monica, Calif. | morleybuilders.com Charles Muttillo, President |
4204 Glencoe Los Angeles 62.00 |
100 General Building |
264.00 | |
49/48 | LANE INDUSTRIES INC. Henderson, Nev. | laneconstruct.com Jose Penalver, Vice President, Construction |
Not Provided | 100 Transportation |
262.96 | |
50/63 | RYAN COS. US La Jolla, Calif. | ryancompanies.com Mike Mahoney, President, West Region |
Retail Distribution Center Sacramento 191.70 |
100 General Building |
249.44 | |
51/51 | HASKELL Jacksonville, Fla. | haskell.com Jim O'Leary, Chairman, CEO & President |
Not Provided | 98 Industrial Process 2 General Building |
241.04 | |
52/— | DESCOR BUILDERS* Roseville, Calif. | descorbuilders.com Tyler Ganyo, President & CEO |
Broadstone Villas Folsom, Calif. 102.00 |
93 General Building 7 Interior/Tenant Improvements |
240.86 | |
53/— | BAY CITIES PAVING & GRADING INC.* Concord, Calif. | baycities.us Benjamen Rodriguez, CEO |
Route 205 (10-1C3304) Multiple Locations in Hawaii 16.56 |
90 Transportation 10 Other Project Types |
223.95 | |
54/— | W.A. RASIC CONSTRUCTION CO. Long Beach, Calif. | warasic.com Pete Rasic, President |
North City Pure Water Pipeline San Diego 123.72 |
55 Water Supply 30 Power 10 Petroleum |
207.14 | |
55/— | CHARGE Sacramento| ChargeEPC.com Michael Robirds, CEO |
Point Mugu Rehab Project Point Mugu, Calif. 6.36 |
54 Power 39 Petroleum 7 Telecommunications |
183.18 | |
56/69 | CSI CONSTRUCTION CO.* Foothill Ranch, Calif. | csigc.com Joe Hall, Vice President |
MIG Fremont Apartments Fremont, Calif. 93.30 |
100 General Building |
180.73 | |
57/64 | MOOREFIELD CONSTRUCTION INC.* Santa Ana, Calif. | moorefieldconstruction.com Mike Moorefield, President |
Sunrise Village Citrus Heights, Calif. 16.70 |
100 General Building |
173.73 | |
58/66 | PINNER CONSTRUCTION CO. Anaheim | pinnerconstruction.com Dirk Griffin, CEO |
Lincoln High School Los Angeles 220.10 |
100 General Building |
169.42 | |
59/53 | TRAYLOR CONSTRUCTION GROUP INC. Evansville, Ind. | traylor.com Christopher S. Traylor, Co-President |
Not Provided | 100 Transportation |
162.16 | |
60/68 | SHAWMUT DESIGN AND CONSTRUCTION* Los Angeles | shawmut.com Greg Skalaski, Executive Vice President |
Ground-Up Cultural Building Culver City, Calif. 8.28 |
100 General Building |
157.16 | |
61/47 | HOLDER CONSTRUCTION San Jose, Calif. | holderconstruction.com Gavin Kalley, Senior Vice President |
Not Provided | 80 Telecommunications 20 General Building |
153.00 | |
62/— | DECKER ELECTRIC CO. San Francisco | deckerelectric.com David Chad, President |
Visa San Francisco 20.00 |
100 General Building |
144.27 | |
63/59 | MILENDER WHITE INC. Newport Beach, Calif. | milenderwhite.com Adam Mack, Southern California District Manager, Executive Vice President |
Citrus Crossing Glendale, Calif. 38.28 |
100 General Building |
140.87 | |
64/67 | OTTO CONSTRUCTION Sacramento | ottoconstruction.com Allison Otto, President & CEO |
Folsom Lake College Science Building Folsom, Calif. 64.95 |
100 General Building |
123.17 | |
65/— | THE BOLDT CO. San Francisco | boldt.com Steve Lind, Vice President, General Manager |
East Bay Cancer Center Oakland, Calif. 231.67 |
91 General Building 8 Manufacturing 2 Industrial Process |
122.26 | |
66/72 | JTM CONSTRUCTION GROUP INC. Culver City, Calif. | jtmagen.com Steven Mount, President |
Equinix SV-12 (Phase 1) San Jose, Calif. 175.00 |
67 Telecommunications 33 General Building |
96.35 | |
67/73 | GARNEY HOLDING CO. Tracy, Calif. | garney.com Bill E. Williams, Vice President |
1,2,3-Trichloropropane Removal Treatment Plant Chino Hill, Calif. 12.54 |
60 Water Supply 40 Sewerage/Solid Waste |
86.98 | |
68/— | JE DUNN CONSTRUCTION CO. Santa Clara, Calif. | jedunn.com Eddie Parenti, Vice President - Northern California Office Lead |
Not Provided | 73 Manufacturing 23 Telecommunications 4 General Building |
83.10 | |
69/80 | SLETTEN COS. Las Vegas | slettencompanies.com Dan Eden, Division Manager |
California Highway Patrol El Centro Facility El Centro, Calif. 34.12 |
65 General Building 35 Power |
79.57 | |
70/— | GSE CONSTRUCTION CO. Livermore, Calif. | gseconstruction.com Dennis Gutierrez, President |
ENGIE WCWD Energy Efficiency Upgrade Richmond, Calif. 17.63 |
100 Sewerage/Solid Waste |
79.18 | |
71/70 | VCC LLC Irvine, Calif. | vccusa.com Don Davis, Executive Vice President |
Public Storage Pleasanton, Calif. 24.71 |
100 General Building |
72.01 | |
72/75 | BERGMANKPRS Brea, Calif. | BergmanKPRS.com Mark Bergman, Managing Member |
Not Provided | 100 General Building |
69.93 | |
73/74 | AGI GENERAL CONTRACTING Stanton, Calif. | agigc.com Chris Gautreau, President |
Grocery Outlet 29 Palms, Calif. 5.10 |
100 General Building |
67.30 | |
74/— | FCL BUILDERS Irvine, Calif. | fclbuilders.com Robert Cavecche, Regional Vice President |
Not Provided | 100 General Building |
65.67 | |
75/77 | GHIRARDELLI ASSOCIATES San Jose, Calif. | ghirardelliassoc.com Randall Bruner, President & CEO |
On-Call Roadway Construction Services, Caltrans District 1Eureka, Calif. 300.00 |
83 Transportation 17 Other Project Types |
45.00 | |
76/82 | IPS-INTEGRATED PROJECT SERVICES LLC Irvine, Calif. | ipsdb.com Patrick Bucklen, Vice President, New Market Strategies |
Not Provided | 100 Industrial Process |
41.60 | |
77/79 | TIS CONSTRUCTION SERVICES INC. Carson, Calif. | tisusa.com Farrel Stevins, CEO |
Marina Imaging Marian Del Rey, Calif. 5.57 |
100 General Building |
26.35 | |
78/78 | GRAYCOR INC.* San Jose, Calif. | graycor.com Tim Hanifin, President |
Not Provided | 100 General Building |
24.29 | |
79/83 | SCHWAGER DAVIS INC. San Jose, Calif. | schwagerdavis.com Mike Schwager, President |
Not Provided | 99 Transportation1 General Building | 22.33 | |
*REVENUE WAS PROVIDED ON A FISCAL-YEAR BASIS. ALL OTHERS PROVIDED CALENDAR-YEAR DATA, WHICH IS PREFERRED. |