The $798,000 Desert Aviation Center at the North Las Vegas Airport is a completely transformed 1970s building, including office and hangar space, landscaping additions, parking lot improvements and energy-efficient LED lighting to replace outdated exterior incandescent fixtures.
Revitalizing south downtown in Albuquerque, the $52.2-million project included 286,000 sq ft of renovation to the eight-story tower at 415 Silver Ave. and construction of the adjacent 12,000-sq-ft Commission Chambers Building.
Nestled between century-old houses in a historic neighborhood, this nearly 100,000-sq-ft modernization project involved renovating a historic building, removing a classroom trailer annex and building an addition.
Stripped of their facades and interiors, two 14-story former office buildings and a connecting lobby were transformed into a 435-unit residential complex.
The first theater in Los Angeles wired for film with sound provides an appropriate setting for a leading technology retailer’s flagship location, thanks to the comprehensive renovation effort that combined seismic upgrades with preservation of distinctive 1920s-era finishes.
This comprehensive adaptive reuse project required lifting a 60,000-sq-ft steel-framed World War Two-era warehouse 12 feet in the air to create a workspace.
The century-old former power station on Sacramento’s riverfront was completely renovated to house more than 27,000-sq-ft of exhibit space and provide an anchor for the Robert T. Matsui Waterfront Park.