One of four buildings at the 397,776-sq-ft Director’s Science Park campus, 4930 Directors Place is a five-story, approximately 150,000-sq-ft life sciences research laboratory and office building.
This LEED Platinum three-building campus is designed to have a climate positive impact while fostering a workplace environment for creative technology workers.
Serving as a model for resilience and sustainability by demonstrating accessible methods to homeowners, developers and small business owners for living and building more sustainably, the structure is designed to “float” during major flooding to ensure operational continuity and demonstrate resiliency.
Project participants contend with poor soil and little laydown space as the 51-story mixed-use structure rises over one of New England’s busiest rail hubs
After decades of planning, the construction of Boston’s newest office and residential tower is proving to be one of the more challenging projects the city has seen.
Hines Global Headquarters in downtown Houston is a 187,000-sq-ft building with next-generation features for the work spaces occupying floors 30-35 of the Texas Tower.
To complete a much needed expansion for Gensler’s Seattle office to cover the entire fifth floor of 1200 6th Avenue, crews had to find new ways to work with limited budget and resources.